More than 150 technical studies and engineering projects carried out, as well as 50 large projects implemented (design, construction, put in operation).

Projects executed in Latin America between 1985 and 2000

Colombia,  Venezuela, Guatemala, Nicaragua, El Salvador
  • Finca Chordelec (ganado lechero) – 1985
  • Finca Andropa (cerdos) – 1986
  • Palmeras del Llano (palma) – 1988
  • Ingenio Mayagüez (caña) – 1989 – 1993 – 2003
  • Carnes y Derivados de Occidente (Matadero de ganado) – 1989
  • Cartones América (papelera) – Desde 1990 hasta 2020
  • Palmar Santa Elena (palma) – 1991
  • Emcali – PTAR «El Vivero» (aguas residuales domésticas) – 1993
  • Ingenios Riopaila y Central Castilla (caña) – 1994
  • Nabisco (vinazas de levadura) – 1996
  • Agrosan (aguas de lavado de rendering) – 1997
  • Restrepo (municipio – 10.000 habitants) – 1997
  • Sololá (municipio de 20.000 habitants) – 1997
  • Panajachel (municipio de 20.000 habitants) – 1998
  • Friko (matadero de pollos) – 1998
  • Fábrica de Café Liofilizado (café soluble) – 1999
  • Tabacal (Urbanización) – 1999
  • Hacienda las Flores (Urbanización) – 1999
  • Palmeiras (palma) – 1999
  • Colombina (fábrica de dulces) – 1999
  • Bosques de Capistrano (condominio) – 2000
  • Colanta Planeta Rica (industria láctea) – 2000
  • Frigorifico Santa Elena (rendering) – 2001
  • Ciudad Corinto (municipio de 20.000 habitants) – 2001
  • Punta Gorda (urbanización) – 2001

Main agro-industrial clients between 2000-2020

Dominican R.
INDUSPALMA:
Biodigester: 13.000 m3
Honduras
EECOPALSA:
Biodigester: 15.000 m3
Biogas use: Electricity generation 1,2 MW
AGROTOR:
Biodigester: 25.000 m3
Biogas use: Electricity generation 840 kW, Steam 8 T/h
EXPORTADORA DEL ATLANTICO:
Biodigester: 26.000 m3
Biogas use: Steam 8 T/h
Fertilisation: Liquid Organic: 1000 ha
HONDUPALMA:
Biodigester: 19.000 m3
Biogas use: Electricity generation 840 kW, Vapor 6 T/h
EECOPALSA II:
Biodigester: 11.000 m3
Biogas use: Electricity generation 920 kW
Colombia

ACEITES MANUELITA S.A.:
Biodigester: 38.000 m3
Biogas use: Electricity generation 1,4 MW, Steam 12 T/h
ORO ROJO:
Biodigester: 15.000 m3
Biogas use: Flaring

Brazil
AGROPALMA:
Biodigester: 50.000 m3
Perú
EL ESPINO:
Biodigester: 19.000 m3
Biogas use: Boiler
Argentina
CITRUSVIL:
Biodigester: 80.000 m3
Biogas use: Steam 16 T/h
Ghana
GOPDC (Ghana-Grupo SIAT):
Biodigester: 13.500 m3
Biogas use: Steam
Nigeria
PRESCO (Nigeria-Grupo SIAT):
Biodigester: 9.500 m3
Biogas use: Steam
Gabon
MAKOUKE (Gabón-Grupo SIAT):
Biodigester: 5.000 m3
Biogas use: Steam
Malasya
ULU KANCHONG:
Biodigester: 32.000 m3
Biogas use: Steam
APM (Sarawak):
Biodigester: 7.000 m3
Biogas use: Electricity generation 810 kW
KAPILIT (Sabah):
Biodigester: 20.000 m3
Biogas use: Electricity generation 1 MW
JENGKA 3 (Grupo Felda):
Biodigester: 30.000 m3
Biogas use: Flaring
SPOM (Sabah):
Biodigester: 20.000 m3
Biogas use: Electricity generation 600 kW, Boiler
Indonesia

PELAKAR (Sumatra):
Biodigester: 20.000 m3
Biogas use: Electricity generation 1,8 MW
BPM (PT Evans-Kalimantan):
Biodigester: 5.000 m3
Biogas use: Electricity generation 830 kW
TUING (PT Evans-Bangka Island):
Biodigester: 20.000 m3
Biogas use: Electricity generation 1,4 MW

BBS:
Biodigester: 20.000 m3
Biogas uses: Electricity generation 2 MW

MSE:
Biodigester: 25.000 m3
Biogas uses: Electricity generation 2 MW

BTB:
Biodigester: 25.000 m3
Biogas uses: Electricity generation 2 MW